Transmission Facilities The control and monitoring of TQM Pipeline's transportation system are made through a control centre located in Calgary. Following an outsourcing agreement, the maintenance of the facilities is realized by TransCanada PipeLines personnel located at Les Cèdres, Lachenaie and Magog. Technical data sheet Type of pipe : steel pipe with a diameter ranging from 114,3 mm (4 in.) to 762 mm (30 in.) Total length of the system : 572 km Distance between mainline valves : 25 km approx. Meter stations and delivery points : 31 Compression : three (3) electrical units of 7.0 MW each at Lachenaie and one (1) electrical unit of 3.2 MW at East Hereford Saint-Lazare to Saint-Nicolas mainline section : 313 km Lachenaie to East Hereford section : 217 km Laterals : 42 km
Right-of-way : 12 m (40 ft) to 23 m (75 ft) Operating pressure Saint-Lazare to Saint-Nicolas mainline section and laterals : Lachenaie to East Hereford Section :
|
|
||||||||||||||||||||||||||||||
| All right reserved © TQM Pipeline | |||||